The project is located at Makwanpur district, Nibutar VDC about 76
kilometers north of Kathmanu. The project is a run-of-the river
hydropower type without any provision for seasonal flood storage for
power generation. Poldumki River is a perennial type of river. The
run-off occurs in the catchments area is because of rainfall and by
perennial contribution of several springs. This is a captive project
and electricity produced will be solely used for the Industries of the
Muktishree Group of companies. The electricity will be used for
Muktishree Pvt. Ltd sister concern Hetauda Lime Industries and Everest
Minerals product.
The capacity of the project is 1.6 MW. The
feasibility study of the project is going on and will be completed
within 6 months .Construction will be started immediately upon
completion of the feasibility study.
![]() | ![]() |
![]() | ![]() |